BARRY BACHOO

SAN FERANDO

Overview

27
27
years of professional experience

Work History

Projects Controls Specialist/ Planning Engineer

Stork Technical Services Limited
Point Lisas Industrial Estate
07.2018 - Current
  • Assigned to the "Cassia C' Brownfield Construction Project (2018-2022). Responsible for:

(i) The development and maintenance of the detailed Procurement and Construction schedule.

(ii) Progress tracking and reporting of entire project

(iii) Assisting the Startup and Commissioning Team

  • Assigned to the TOPR Onshore Piping Construction Project. (Oct 2022-March 2023)
  • Assigned Ocelot Pipeline Construction Project (March 2023-Present)

Deputy Project Manager

Innovo Engineering
Point Fortin
10.2017 - 07.2018
  • Managed and coordinated the day-to-day operations of the project team for the construction of the Point Fortin General Hospital
  • Monitored progress against project timeline, budget, and milestones for the 'wetworks' scope.
  • Developed detailed plans for each phase of the project, including resource allocation.
  • Conducted regular meetings with stakeholders to review project status and provide updates.
  • Resolved conflicts between stakeholders through creative problem solving techniques.
  • Assisted in developing innovative strategies to meet customer requirements while staying within budgetary limits.

Lead Planning Engineer

Fircroft Limited assigned to BP's Cat B Projects
Port Of Spain
01.2016 - 07.2017
  • Developed, maintained, and updated a master control schedule inclusive of resources, milestones, risk, and key performance indicators.
  • Worked with the Engineering Contractor's Project Services Team to ensure planning and scheduling activities are aligned to BP's standards.
  • Developed progress measurement templates and s-curves to track project progress.
  • Reported on the construction progress to the upper management team on the construction phase of the project.
  • Worked with project team to develop inputs for PERT analysis and probabilistic schedules (P10, P50 and P90)

Project Co Ordinator Assigned to Atlas 2016 TAR

Methanex Trinidad Limited
Point Lisas Industrial Estate
07.2015 - 01.2016
  • Responsible for scope management, schedule development, maintaining action log, risk register, and risk action log.
  • Developed strategies to increase team productivity by streamlining processes and procedures.
  • Provided technical support to team members when needed during project execution.

Construction Planner/ Project Engineer

Amec Foster Wheeler
Port Of Spain
12.2012 - 06.2015
  • Construction planner responsible for the development of the detailed construction schedule for a 50,000 cubic meter water recycling plant at Beetham Wastewater Complex.
  • Project Engineer assigned to NGC's Beachfield Condensate Storage and Compressor Facility. Responsible for timely delivery of detailed design engineering deliverables, progress measurement, invoicing, coordination between engineering disciplines.
  • Project Engineer, seconded to Trinity Exploration and Production Limited. Monitored the upgrade of Marine Platform No. 8 in the Brighton Field. Also functioned as the Project Manager for the topside facilities design.

Project Planner/ Scheduler

Atlantic
Point Fortin
06.2011 - 11.2012
  • Created detailed project plans, including timelines, resources, and budgeting for all Brown Field projects being executed by the Projects Group.
  • Developed risk management strategies to mitigate potential issues with projects.
  • Created and updated milestone deadlines to account for changing information from procurement, production and client representatives.

Project Engineer

Fluor Daniels South American Limited
Port Of Spain
08.2010 - 05.2011
  • Seconded to BGTT, assigned to NCMA/CB Asset Integrity and Brownfield Projects.
  • Responsible for entering, updating, and tracking work orders in Maximo, facilitation of MOC initiation and closeout. Also responsible for review of vendor invoices, preparation of project documents.
  • Prepared project documents, coordinated between engineering contractor, procurement and the construction team.

Project Engineer Seconded to BPTT

Neal And Massy Wood Group
Chaguanas
05.2010 - 07.2010
  • Tagged to the Flambouyant / NUI Compliance Project and Produced Water Project. Responsible project documents, engineering disciplines, tracking and reporting progress.

Scheduling Lead/ Project Engineer

ABT Engineers and Constructors Ltd
Marabella
07.2005 - 04.2010
  • Involved in the planning, scheduling, control, and execution between engineering disciplines and the client.
  • Formulation and tracking of project schedules, preparation of trends and overall portfolio management for Petrotrin GOP Offsites and Utilities Project.
  • Responsible for the planning, schedulingand execution of projects for ALNG General Works Contract. Including pressure rerate, filter coalescer, ISPS and Trains 1,2,3.

Project Manager

United Engineering Services Limited
Point Lisas
02.1998 - 06.2004
  • Involved in the planning, scheduling and execution of LBI Water Rehabilitation project( East Coast Guyana
  • Overall responsible for Project Controls for the construction of Sewage Treatment Plant, Teteron Barracks, construction of health center at Biche and Brothers Road, and the rehabilitation of Freeport Water Treatment Plant.

Planner/ Scheduler

Weldfab Limited
Claxton Bay
11.1997 - 02.1998
  • Worked on the Farmland MissChem Ammonia Plant Project.
  • Involved in the planning and scheduling of activities for contractors.

Education

Industrial Engineering

University Of The West Indies
St . Augustine
05-1997

Skills

  • Proficient in Microsoft Project and Primavera P6
  • Experienced in the use of Microsoft Powerpoint, Teams, Excel and Word
  • Working experience in Critical Path method and Earned Value
  • Extensive knowledge of Turnaround Planning and Scheduling
  • Excellent communication, interpersonal and influence skills
  • Ability to manage and work independently without supervision
  • Ability to interpret engineering drawings and specifications

ADDITIONAL QUALIFICATIONS

Project Management Professional (PMP # 1359937)

PMI- Risk Management Professional(PMI-RMP #1727490)

Registered Engineer with the Board of Engineering Trinidad and Tobago # 1062

REFEREES

Feroze Khan

TAR Manager

Methanex

620-0337

Theron Ousman

Manager

AMEC Foster Wheeler

686-1790

Timeline

Projects Controls Specialist/ Planning Engineer

Stork Technical Services Limited
07.2018 - Current

Deputy Project Manager

Innovo Engineering
10.2017 - 07.2018

Lead Planning Engineer

Fircroft Limited assigned to BP's Cat B Projects
01.2016 - 07.2017

Project Co Ordinator Assigned to Atlas 2016 TAR

Methanex Trinidad Limited
07.2015 - 01.2016

Construction Planner/ Project Engineer

Amec Foster Wheeler
12.2012 - 06.2015

Project Planner/ Scheduler

Atlantic
06.2011 - 11.2012

Project Engineer

Fluor Daniels South American Limited
08.2010 - 05.2011

Project Engineer Seconded to BPTT

Neal And Massy Wood Group
05.2010 - 07.2010

Scheduling Lead/ Project Engineer

ABT Engineers and Constructors Ltd
07.2005 - 04.2010

Project Manager

United Engineering Services Limited
02.1998 - 06.2004

Planner/ Scheduler

Weldfab Limited
11.1997 - 02.1998

Industrial Engineering

University Of The West Indies
BARRY BACHOO