Summary
Overview
Work History
Education
Skills
Affiliations
Timeline
Awards
Professional Capacity
References
Generic

Ravi Beekham

Penal

Summary

To contribute by providing leadership in a dynamic and challenging industrial environment that fosters innovation and growth, leveraging my expertise to drive organizational success while continuing my professional development.

Currently serving as Acting Technical Manager(approx. 4 months continuously) with over eight years of experience as Engineering Team Lead and an additional eleven years as a Project Engineer. Proven track record in project management, engineering construction, plant upgrades, and turnaround projects. Adept at leading cross-functional teams, optimizing processes, and delivering complex projects within scope, time, and budget.

Overview

28
28
years of professional experience

Work History

Engineering Team Lead

Methanex Trinidad Limited
07.2017 - Current
  • Led the integration of the Titan ASU inclusive of Operational transition and training, Maintenance procedures and PMs and Reliability improvement and MAH projects.
  • Led cross functional teams to effectively coordinate the Atlas ASU integration activities.
  • Supervised project management team for the Atlas 2020 DCS upgrade.
  • Supervised the successful implementation of the EMOC rollout to the Trinidad site in 2022.
  • Supervised the successful implementation and rollout of the Methanol Fuel blending initiative that involved the government and NGC.
  • Supervision of the structural upgrade of the Atlas Cooling tower with prudent cost and RC management. Significant cost savings achieved.
  • Supervised Capex management and led Opex management of the Atlas and Titan plants. Achieved Global Capex performance by implementing tight Capex and Opex control.
  • Solved Atlas Water treatment contamination issue and implemented projects to avoid a recurrence on Atlas and Titan.
  • Led the engineering team to successfully complete two turnarounds (one on Atlas(2020) and one on the Titan plant (2019)).
  • Engineering Management, Project Cost estimation, SOW and RFQ preparation, Project Management, Planning and Scheduling. QA/QC Management, Engineering design and supervision of engineering design.
  • Led engineering team in design and implementation of process improvements to reduce GHG including the Offgas to the ATR project.
  • Facilitated knowledge sharing among team members by organizing workshops and training sessions, promoting a collaborative work environment.
  • Developed cost estimates and project specifications for proposals including Opex and Capex projects.

Engineer III

Methanex Trinidad Limited
07.2013 - 07.2017
  • Supervised DCS 2016 field installation upgrade project at the Atlas Methanol plant.
  • Supervised Bently Control system upgrade and the Titan plant quench valve upgrade projects.
  • Coordinated the Technical and projects team to deliver Turnaround and Outage projects on time, within cost and within schedule.
  • Led engineering teams to successfully complete key Insurance Audit action projects including Static and E&I projects on time and within budget.
  • Developed cost estimates and project specifications for proposals.
  • Mentored junior engineers, promoting professional growth and enhancing team capabilities.

Project Engineer

NM Insertech Caribbean Limited
11.2011 - 06.2013
  • Led project planning and execution of the phase 1 and phase 11 refurbishment works for the Atlas Modular Cooling tower-piping, structural and rotating equipment works.
  • Provided Engineering and execution oversight to facilitate correction of electrical fluting issues on the Auxiliary boiler combustion air fan motor.
  • Supervision of the Upgrade of Electro-chlorination plant with Siemens Water technologies – piping, cells, control system and flowmeters.
  • Worked as a support engineer on Atlas Methanol 2012 Foxboro DCS upgrade.
  • Supervising the engineering design and installation of the Fire protection system upgrade for Titan Methanol tanks.
  • Management of Titan Cooling tower shroud guard installation project.
  • Management of Natural gas and Synthesis gas analyser installation project.

Project Engineer

Petrotrin
Pointe-a-Pierre
02.2010 - 11.2011
  • FCCU Phase II Upgrade project manager.
  • Collaborated with cross-functional teams to ensure project alignment and timely delivery.
  • Analyzed project performance metrics to identify areas for improvement and optimization.
  • Coordinated with stakeholders to define project scope, objectives, and deliverables.
  • Managed budgets effectively for multiple projects, ensuring financial targets were met.
  • Management of installation of cable trenches and duct banks, Instrument procurement, Calibration, field installation and loop checks.
  • Led the preparation of QA/QC handover documentation.
  • Evaluated change order requests in response to out-of-scope work activities.

Project Engineer

Petrotrin
Pointe-a-Pierre
09.2007 - 02.2010
  • Supervised installation of E&I Systems for World Gas to Liquids plant.
  • Supervised installation of interconnecting power supply from Concorde Substation to plant MCC.
  • Led final acceptance testing for the GTL MCC Building.
  • Negotiated contracts with vendors to secure advantageous terms, contributing to cost savings.
  • Led project planning and execution, ensuring alignment with client specifications and industry standards.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.

Project Engineer

Point Lisas Industrial Estate/Valero Aruba Refinery
12.2006 - 08.2007
  • Replacement of Instrumentation and cabling to Fin fans at YARA Trinidad limited.
  • Installation of power supply and UPS system for the IT department at Methanex Trinidad Limited.
  • Supervised refurbishment of instrumentation, lighting and earthing systems on ten(10) existing crude tanks and the Coke Barn at refinery.
  • Supervised successful Switchgear upgrade for the Holiday Inn hotel in Aruba.
  • Estimated, bid and executed projects for American contractors at the VARC refinery.
  • Supervised the preparation and handover of QA/QC handover documentation to the VARC refinery.

Project Engineer

Insertech Aruba N.V.
Valero Aruba Refinery
12.2005 - 11.2006
  • Led estimation, projects for the Installation of lighting, instrumentation and power for the Sulphur Handling unit in the VARC refinery.
  • Supervision of the E&I upgrade to the Gasoil Hydrorefinery Unit.
  • Management of all E&I works for the H3AR and C6C7 units Turnaround.
  • Led the preparation of QA/QC handover documentation.
  • Developed detailed project documentation, including scope definitions, schedules, and resource allocations.
  • Led project planning and execution, ensuring alignment with client specifications and industry standards.

Electrical/Quality Engineer

Retrofit Trinidad Limited
12.2005 - 11.2006
  • Contributed to root cause analysis to determine core reason for failures and errors.
  • Performed quality inspections and drafted reports to detail non-conforming material issues.
  • Conducted detailed audits to ensure adherence to ISO 9001 standards, maintaining a high level of compliance throughout the organization.

Plant Operator

Industrial Plant Services Limited (IPSL)
12.2005 - 11.2006
  • Supervision of product loading activities.
  • Used collected equipment data to observe trends in equipment performance and furnishing of this data to the Maintenance department for further analysis/action.
  • Supported with diagnosing and trouble-shooting of equipment maintenance related problems.
  • Operated and monitored plant equipment to ensure optimal performance and safety standards including turbines and pumps.

Electrical Technician

Ministry of Health
San Fernando General Hospital
07.1998 - 06.1999
  • Supervised and performed permanent Electrical installations for annexes, refurbished buildings.
  • Diagnosed and repaired electrical systems within healthcare facilities, ensuring compliance with safety standards.
  • Conducted routine maintenance on electrical equipment to optimize operational efficiency and reliability.

Education

MBA - Business Administration

Heriott-Watt University

B.Sc - Electrical and Computer Engineering, Major in Power Systems and Mathematics

UWI

Diploma - Electrical Electronic Engineering Technician

Diploma - Industrial Instrumentation Engineering Technician

Certificate - Primavera P6 Scheduling

International Society of Automation (ISA)

Certificate - Instrument Calibration

Certificate - Industrial Maintenance

Metal Industries Company Ltd. (MIC)

Certificate - Occupational Health and Safety (OSHA)

UWI, St Augustine

GCE A'LEVEL - Mathematics, Physics, Chemistry and General Paper

Naparima College

CXC O'LEVEL -

Iere High School

Skills

  • Project Management
  • People management
  • Plant Integration

Affiliations

  • A member of the Certified Business Professionals (CBP) in project Management
  • A member of International Society of Automation (ISA)

Timeline

Engineering Team Lead

Methanex Trinidad Limited
07.2017 - Current

Engineer III

Methanex Trinidad Limited
07.2013 - 07.2017

Project Engineer

NM Insertech Caribbean Limited
11.2011 - 06.2013

Project Engineer

Petrotrin
02.2010 - 11.2011

Project Engineer

Petrotrin
09.2007 - 02.2010

Project Engineer

Point Lisas Industrial Estate/Valero Aruba Refinery
12.2006 - 08.2007

Project Engineer

Insertech Aruba N.V.
12.2005 - 11.2006

Electrical/Quality Engineer

Retrofit Trinidad Limited
12.2005 - 11.2006

Plant Operator

Industrial Plant Services Limited (IPSL)
12.2005 - 11.2006

Electrical Technician

Ministry of Health
07.1998 - 06.1999

MBA - Business Administration

Heriott-Watt University

B.Sc - Electrical and Computer Engineering, Major in Power Systems and Mathematics

UWI

Diploma - Electrical Electronic Engineering Technician

Diploma - Industrial Instrumentation Engineering Technician

Certificate - Primavera P6 Scheduling

International Society of Automation (ISA)

Certificate - Instrument Calibration

Certificate - Industrial Maintenance

Certificate - Occupational Health and Safety (OSHA)

UWI, St Augustine

GCE A'LEVEL - Mathematics, Physics, Chemistry and General Paper

Naparima College

CXC O'LEVEL -

Iere High School

Awards

National Scholarship awarded in Electrical Electronic Engineering

Professional Capacity

PROJECT/E&I ENGINEERING TEAM LEAD

References

  • Rishi Paryag, Maintenance & Reliability Manager at Natgasoline LLC, 19177055309
  • Adesh Balliram, Senior Project Manager / EI&C Engineer at Venture Global LNG, Arlington, VA, USA, 15044935418
Ravi Beekham