Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Certification
Additional Information
Timeline
References
Awards Received
Professional Capacity
background-images

Ravi Beekham

Penal

Summary

To work in a dynamic and challenging Project and Engineering oriented environment that affords opportunities to enterprising individuals to actively participate in the development of self and organization.

Project/E&I engineer with approximately seven years experience in the field of project management, engineering construction, plant upgrades and turnaround projects.

Overview

27
27
years of professional experience
1
1
Certification

Work History

Engineering Team Lead

Methanex Trinidad Limited
07.2017 - Current
  • Project management of the Atlas DCS upgrade
  • Installation of an upgraded level measurement system for the Titan Cooling tower
  • Supervised the development and implementation of a solution to avoid under quenching of steam into the fired heater coil. Relocated temperature measurement system and upgraded a quench valve to ensure better quench control of steam
  • Fireproofing of the Atlas Distillation rack
  • Supervision of the structural upgrade of the Cooling tower
  • Supported CAPEX management and led OPEX management of the Atlas and Titan plants for 2022
  • Supervised a CAPEX project to modify piping and implement a protection system to avoid contamination of our Demin water.
  • Led the engineering team to successfully complete two turnarounds (one on Atlas(2020) and one on the Titan plant(2019))
  • Engineering Management, Project Cost estimation, SOW and RFQ preparation, Project Management, Planning and Scheduling. QA/QC Management, Engineering design and supervision of engineering design

Project Engineer

NM Insertech Caribbean Limited
11.2011 - Current
  • Supervision of the phase 1 and phase 11 refurbishment works for the Atlas Modular Cooling tower-piping, structural and rotating equipment
  • Engineering and supervision of the power supply installation for the AC installation for Warehouse #2 and the Titan substation
  • Engineering and supervision of correction of electrical fluting issues on the Auxiliary boiler combustion air fan motor
  • Supervision of the Upgrade of Electro-chlorination plant with Siemens Water technologies – piping, cells, control system and flowmeters
  • Working as a support engineer on Atlas Methanol Foxboro DCS upgrade
  • Supervision of the engineering design and installation of the Firewater sprinkler systems for Atlas and Titan pump houses
  • Supervising the engineering design and installation of the Fire protection system upgrade for Titan Methanol tanks
  • Management of Titan Cooling tower shroud guard installation project
  • Management of Natural gas and Synthesis gas analyser installation project
  • Supervision of E&I works on the LP Steam system upgrade of Atlas methanol plant
  • Engineering Management, Project Cost estimation, SOW and RFQ preparation, Project Management, Planning and Scheduling. QA/QC Management, Engineering design and supervision of engineering design

Engineer III

Methanex Trinidad Limited
07.2013 - 07.2017
  • Supervised DCS field installation upgrade project at the Atlas Methanol plant
  • Installed a fire detection system for the Atlas and Titan product methanol tanks
  • Supervised piping upgrade for the Atlas Modular cooling tower along with fill replacement
  • Supervised Bently Control system upgrade and Titan plant UPS upgrade
  • Coordinated the Technical and projects team to deliver Turnaround and Outage projects on time and within schedule
  • Engineering Management, Project Cost estimation, SOW and RFQ preparation, Project Management, Planning and Scheduling. QA/QC Management, Engineering design and supervision of engineering design

Project Engineer

Petrotrin
02.2010 - 11.2011
  • FCCU Phase II Upgrade project
  • Turnaround projects
  • Security Camera installation
  • Planning and supervision of E&I activities for Turnaround projects
  • Supervision of installation of all Electrical Power cabling
  • Supervision of installation of Plant earthing
  • Management of installation of cable trenches and duct banks, Instrument procurement, Calibration, field installation and loop checks
  • Management of installation of instrument cable tray and junction boxes
  • Final acceptance testing for the MCC
  • Schedule management
  • Progress tracking and updating
  • Productivity measurement
  • Preparation of QA/QC handover documentation
  • Engineering Management, Project Cost estimation, SOW and RFQ preparation, Project Management, Planning and Scheduling. QA/QC Management, Engineering design and supervision of engineering design

Project Engineer

Petrotrin
09.2007 - 02.2010
  • Installation of E&I Systems for World Gas to Liquids plant
  • Installation of interconnecting power supply from Concorde Substation to plant MCC
  • Supervision of installation of all Electrical Power cabling
  • Supervision of installation of Plant earthing
  • Supervision of installation of cable trenches and duct banks, Instrument procurement, Calibration, field installation and loop checks
  • Management of installation of instrument cable tray and junction boxes
  • Final acceptance testing for the MCC
  • Schedule management
  • Progress tracking and reporting
  • Productivity measurement
  • Preparation of QA/QC handover documentation
  • Engineering Management, Project Cost estimation, SOW and RFQ preparation, Project Management, Planning and Scheduling. QA/QC Management, Engineering design and supervision of engineering design

Project Engineer

Point Lisas Industrial Estate/Valero Aruba Refinery
12.2006 - 08.2007
  • Installation of road lighting system at Trinidad Cement Limited, Mayo
  • Replacement of Instrumentation and cabling to Fin fans at YARA Trinidad limited
  • Installation of power supply and UPS system for the IT department at Methanex Trinidad Limited
  • Replacement of earthing, lighting and power systems at the Coke Barn on the Valero Aruba Refinery
  • Installation of instrumentation, lighting and earthing systems on new crude tanks
  • Refurbishment of instrumentation, lighting and earthing systems on ten(10) existing crude tanks at refinery
  • Switchgear upgrade for the Holiday Inn hotel
  • Supervision of installation of all Electrical Power cabling
  • Supervision of installation of Plant earthing
  • Supervision of instrument procurement, calibration, field installation and loop checks
  • Management of installation of instrument cable tray and junction boxes
  • Manpower scheduling
  • Schedule management
  • Progress tracking and reporting
  • Productivity measurement
  • Preparation of QA/QC handover documentation

Project Engineer

Insertech Aruba N.V.
12.2005 - 11.2006
  • Installation of lighting, instrumentation and power for the Sulphur Handling unit in the VARC refinery
  • Supervision of the E&I upgrade to the Gasoil Hydrorefinery Unit
  • Management of all E&I works for the H3AR and C6C7 units Turnaround
  • Supervision of installation of all Electrical Power cabling
  • Supervision of installation of Plant earthing
  • Supervision of instrument procurement, calibration, field installation and loop checks
  • Management of installation of instrument cable tray and junction boxes
  • Schedule management
  • Progress tracking and reporting
  • Productivity measurement
  • Preparation of QA/QC handover documentation

Electrical/Quality Engineer

Retrofit Trinidad Limited
12.2005 - 11.2006
  • Assisting in the management of the Quality Management system

Plant Operator

Industrial Plant Services Limited (IPSL)
12.2005 - 11.2006
  • Supervision of product loading activities
  • Participation in projects aimed at improving productivity and reducing operating cost
  • Using collected equipment data to observe trends in equipment performance and furnishing of this data to the Maintenance department for further analysis/action
  • Sub-contractor management
  • Sampling and testing process streams in accordance with QA system
  • Routine Plant checks
  • Assisting maintenance technicians in the performance of maintenance and repairs
  • Assisting with diagnosing and trouble-shooting of maintenance related issues

Electrical Technician

Ministry of Health
07.1998 - 06.1999
  • Temporary field installations
  • Permanent Electrical installations for annexes, refurbished buildings
  • Maintenance of Diesel generator and key motors
  • Sub-contractor management
  • Electrical support for Mechanical works
  • Maintenance of hospital power and lighting systems

Education

MBA - Business Administration

Heriott-Watt University

B.Sc - Electrical and Computer Engineering, Major in Power Systems and Mathematics

UWI

Diploma - Electrical Electronic Engineering Technician

Diploma - Industrial Instrumentation Engineering Technician

Certificate - Primavera P6 Scheduling

Certificate - Instrument Calibration

International Society of Automation (ISA)

Certificate - Introduction to PLCs

Certificate - Industrial Maintenance

Metal Industries Company Ltd. (MIC)

Certificate - Occupational Health and Safety (OSHA)

UWI, St Augustine

GCE A'LEVEL - Mathematics, Physics, Chemistry and General Paper

Naparima College

CXC O'LEVEL - Mathematics, Physics, Chemistry, Biology, Spanish, Geography, English A, English B

Iere High School

GCE A/O' LEVEL - Additional Mathematics

Iere High School

Skills

  • Product design
  • Software development
  • Continuous delivery
  • Performance optimization

Accomplishments

  • Achieved [Result] through effectively helping with [Task].

Affiliations

  • A member of the Certified Business Professionals (CBP) in project Management
  • A member of International Society of Automation (ISA)

Certification

  • PMP Certified
  • CBP Project Management Professional Certificate

Additional Information

Building knowledge in Finance

Timeline

Engineering Team Lead

Methanex Trinidad Limited
07.2017 - Current

Engineer III

Methanex Trinidad Limited
07.2013 - 07.2017

Project Engineer

NM Insertech Caribbean Limited
11.2011 - Current

Project Engineer

Petrotrin
02.2010 - 11.2011

Project Engineer

Petrotrin
09.2007 - 02.2010

Project Engineer

Point Lisas Industrial Estate/Valero Aruba Refinery
12.2006 - 08.2007

Project Engineer

Insertech Aruba N.V.
12.2005 - 11.2006

Electrical/Quality Engineer

Retrofit Trinidad Limited
12.2005 - 11.2006

Plant Operator

Industrial Plant Services Limited (IPSL)
12.2005 - 11.2006

Electrical Technician

Ministry of Health
07.1998 - 06.1999

B.Sc - Electrical and Computer Engineering, Major in Power Systems and Mathematics

UWI

Diploma - Electrical Electronic Engineering Technician

Diploma - Industrial Instrumentation Engineering Technician

Certificate - Primavera P6 Scheduling

Certificate - Instrument Calibration

International Society of Automation (ISA)

Certificate - Introduction to PLCs

Certificate - Industrial Maintenance

Metal Industries Company Ltd. (MIC)

Certificate - Occupational Health and Safety (OSHA)

UWI, St Augustine

GCE A'LEVEL - Mathematics, Physics, Chemistry and General Paper

Naparima College

CXC O'LEVEL - Mathematics, Physics, Chemistry, Biology, Spanish, Geography, English A, English B

Iere High School

GCE A/O' LEVEL - Additional Mathematics

Iere High School

MBA - Business Administration

Heriott-Watt University

References

Mahindranath, Santoo, Senior Process Engineer, 717-5019, Methanex and ALNG, now an entrepreneur, Others available upon request

Awards Received

National Scholarship awarded for most outstanding student in the department Electrical Electronic Engineering in both John Donaldson and San Fernando Technical Institute., Managed and participated in the Blackwater Village Council Team that placed 6th. Overall in the Prime Minister’s Best Village Trophy Competition

Professional Capacity

PROJECT/E&I ENGINEERING TEAM LEAD
Ravi Beekham