Niquan Energy Trinidad Limited, 06/2016-04/2024, Production Supervisor at NETL Plant Site, Petrotrin Compound, Pointe -A- Pierre Refinery, Pointe-A-Pierre, Reports to Head of Operations and directs and supervises the operations of “B Shift” (comprising 10 persons in total-Operations & Laboratory) and Plant to safeguard the health, safety and well-being of all personnel and equipment. Daylight duties as Plant Start Up Superintendent while Head of Operations was re-assigned to Night Coverage for Plant Start Up in 2nd Quarter 2022. Night Coverage Plant Start Up Superintendent covering all Continuous Operating Shifts during 6 month period (3rd quarter 2022-1st quarter 2023). Directly responsible for achieving First “On-Spec” Diesel end of August, 2022 and developed official guidelines for the Operations Department in Start Up of the Hydrocracker & Product Recovery System and Achieving “OnSpec” Diesel & Naphtha. Directly responsible for initiating and over-seeing several successful MOC’s implemented for bettering the operation of the Hydrocracker & Product Recovery System. Directly responsible for over-seeing the successful catalyst changeout of the Hydrocracker Catalyst in 2nd quarter 2023. Designated System Owner for Demineralisation Plant (PS-7), Hydrocracker & Product Recovery(PS-23) & Diesel, Naphtha, Wax Storage and Transfer(PS-24) and responsible for writing all Standard Operating Manuals(SOM’s), Standard Operating Procedures(SOP’s), Pre-Commissioning and Commissioning Procedures(Pre-Com Procedures), Standard Operating Control Limits(SOCL’s) and Emergency Procedures. Initiates and participates in Special Investigations such as Accident/Incident Investigations, Job Hazard & Process Hazard Analyses, Risk Assessment Ranking Exercises, P& ID Reviews, Design Engineering Reviews and All Plant Hazops. Active member of the Emergency Response Team and serves as the Incident Commander(Off Shift) for any Plant Emergencies. Active team member of staff recruitment for all NETL Junior Operators including reviewing Resumes, short listing suitable candidates, conducting Interviews and eventually selecting suitable candidates. Responsible for developing all Sub-ordinates Training and Development Plans, providing timely feedback and executing all Appraisal and Assessment exercises for my Shift Employees. Participated in EFT and Parc Synthesis Loop Catalyst Testing in Tulsa and Pittsburgh, USA respectively. Co-ordinator of the Operator Training Program for Junior Operators. Responsible for generating weekly Process System Reports and System Punchlists so that any abnormalities from P&ID’s, ISO’s and Actual Implementation by Construction in the Field can be flagged and recorded, thereby assisting Construction in completing Process Systems. Responsible for executing all the responsibilities associated with being a System owner during Pre-Commissioning and Commissioning of Process Systems inclusive of Air Blowing, Water Flushing, Mechanical Cleaning, Chemical Blowing or Steam Blowing Activities.